Safety engineering
Rapita Verification Suite (RVS)
Evidence strength: Strong How this is scored
Rapita Verification Suite for requirements-based testing, MC/DC coverage, WCET timing and scheduling visualization. Qualification kits for DO-178C; kits have supported more than 20 DO-178B and C projects up to DAL A. Rapi Coupling is in development (expected H1 2027).
Certification evidence
Maps to 3 DO-178C / related aerospace guidance requirements — see which with Pro
Maps to 1 ISO 26262 requirement — see which with Pro
Analyst assessment: 1 DO-178C / related aerospace guidance requirement — see which with Pro
Analyst assessment: 1 DO-330 requirement — see which with Pro
Certification relevance. Cited pages map this listing to DO-178C / related aerospace guidance (3 requirements) and ISO 26262 (1 requirement).
Cited page: Rapita Verification Suite (RVS) — a named DO-178C / related aerospace guidance requirement.
Cited page · The quoted wording is Pro.
Listing detail and source evidence (Pro)
Included on Pro, Team and Enterprise. Public summaries, tags and official links on this page stay free.
Cited mappings and analyst assessments (Pro)
Included on Pro, Team and Enterprise. Public summaries, tags and official links on this page stay free.
Procurement evidence pack (Pro) — print cited mappings and analyst notes. The print view is not on this page.
- Vendor / publisher
- Rapita Systems
- Type
- Commercial
- Official site
- https://www.rapitasystems.com/products/rvs
- Industries
- Frameworks named on cited source
- Last verified
Listing is not an endorsement, certification or recommendation. Capabilities, availability and framework support can change. Confirm with the vendor and the relevant authority. See the disclaimer.