Safety engineering

Rapita Verification Suite (RVS)

Evidence strength: Strong 4 cited · 2 analyst How this is scored

Rapita Verification Suite for requirements-based testing, MC/DC coverage, WCET timing and scheduling visualization. Qualification kits for DO-178C; kits have supported more than 20 DO-178B and C projects up to DAL A. Rapi Coupling is in development (expected H1 2027).

Certification evidence

4 cited mappings · 2 analyst assessments across 3 frameworks. Counts are public. Requirement labels and quotes stay on Pro.

Maps to 3 DO-178C / related aerospace guidance requirements — see which with Pro

Maps to 1 ISO 26262 requirement — see which with Pro

Analyst assessment: 1 DO-178C / related aerospace guidance requirement — see which with Pro

Analyst assessment: 1 DO-330 requirement — see which with Pro

Certification relevance. Cited pages map this listing to DO-178C / related aerospace guidance (3 requirements) and ISO 26262 (1 requirement).

Cited page: Rapita Verification Suite (RVS) — a named DO-178C / related aerospace guidance requirement.

Cited page · The quoted wording is Pro.

Listing detail and source evidence (Pro)

Included on Pro, Team and Enterprise. Public summaries, tags and official links on this page stay free.

See plans · Sign in

Cited mappings and analyst assessments (Pro)

Included on Pro, Team and Enterprise. Public summaries, tags and official links on this page stay free.

See plans · Sign in

Procurement evidence pack (Pro) — print cited mappings and analyst notes. The print view is not on this page.

Vendor / publisher
Rapita Systems
Type
Commercial
Official site
https://www.rapitasystems.com/products/rvs
Industries
Frameworks named on cited source
Last verified

Listing is not an endorsement, certification or recommendation. Capabilities, availability and framework support can change. Confirm with the vendor and the relevant authority. See the disclaimer.